References from Colibri bv
Ammonia Absorption Plants
For references from colibri bv for ammonia absorption plants, look at our ‘List of References‘.
Engineering Services
Find below some recent examples of engineering service works:
- Evaluation for a an extension of an existing ARP operating at -56°C with a second stage to increase the COP. In order to improve the overall efficiency in a German freeze dry factory the load distribution to the different consumers was investigated in relation to the time pattern, refrigeration capacity and required temperature.
- For an Italian plant the engineering was done to add a steam heated desorber next to directly fired one. Due to fluctuating energy prices, the customer wants to be more flexible in being able to use steam from a CHP or directly methane as heat source for the ARP.
- For a large freeze-dry coffee plant with several ARPs in operation, it was investigated which measures must be taken to increase the refrigeration capacities to a maximum with only small additional investments.
Research and Development
Have a look at https://www.hymethship.com/consortium/index.html as an example of our participation in an international R&D project.